Log in

USACE NAV/OPS Report

Tuesday, January 28, 2020 6:40 PM | Anonymous

USACE NAV/OPS Report

23 January 2020

CHARLESTON HARBOR POST 45:

-Entrance Channel Contract 1:  GLDD hopper dredge Terrapin Island dredging AS-4.

-Entrance Channel Contract 2:  GLDD hopper dredges Dodge Island and Padre Island dredging maintenance material in AS-6. Hopper Dredge Ellis Island working in AS-1.

-Lower Harbor Contract to Wando Welch Terminal (WWT):  Norfolk Dredging bucket dredges Atlantic and Virginian dredging new work material in Wando River reaches.

-Lower Harbor Contract to Hugh Leatherman Terminal (HLT): Solicitation pending revisions to Project Partnership Agreement.

-Upper Harbor Contract:  Southern Dredging has completed Shoal 8 Ordnance Reach Turning Basin and TC Dock.  Dredge Brunswick has been released to Savannah and Dredge Cherokee is schedule to arrive by 1 FEB 20 to begin Shoal 7 Ordnance Reach.

CHARLESTON HARBOR O&M:

-FY19 CHARLESTON HARBOR UPPEER REACHES O&M:  Southern Dredging has mobilized.  Options for Shipyard River and TC Dock awarded.  BD surveys for Shoal 7 Ordnance Reach, Shoal 8 Ordnance Reach Turning Basin and TC Dock complete.

AIWW:

-FY18 AIWW CRITICAL SHOAL DREDGING WINYAH BAY TO CHARLESTON: Goodloe has completed Shoal 6 Matthews Cut.  Dredge has been released to Wilmington.  Anticipate return of dredges in March to complete the project. 

.


CONNECT WITH US


Call: 
843-577-7678
 
Email:
staff@maritimesc.org

  
Mail:  
 4500 Leeds Ave, Suite 207
   N. Charleston, SC  29405

   
    Visit:
     4500 Leeds Ave, Suite 207
   N. Charleston, SC  29405

Powered by Wild Apricot Membership Software