Log in

SC Ports LeadLine March 2020

Tuesday, March 24, 2020 11:22 AM | Anonymous

LeadLine: Intel for Savvy S.C. Port Clients         March 2020

Video: COVID-19 Update #2 From SC Ports (March 20,2020)

TEUs, Vehicles, and Inland Ports All Increase

HLT construction on-track for 2021 opening.

S.C. Ports had a record February for both cargo volumes at oceanside terminals and rail moves at inland ports. S.C. Ports moved 197,214 twenty-foot equivalent container units (TEUs) across the Wando Welch and North Charleston container terminals in February. SCPA has handled nearly 1.64 million TEUs thus far in fiscal year 2020, from July through February, a 4% increase from the same time a year ago. The country's newest container terminal, the Hugh K. Leatherman Terminal, is on track to open in March 2021.

Volume Increase/HLT On-Track

Near-Port Spec Buildings Offer Ready Now Solutions

More than 7 million square feet of Class A spec buildings near SC Ports.

Spec building has dramatically accelerated near SC Port facilities in Charleston and Greer providing consumer goods importers with ready now solutions. Move-in-ready Class A buildings range from 100,000 sf single-loading facilities to 500,000 sf dual-load crossdocks with expansion capabilities up to 1 million sf. All of these buildings feature connections to high-performance port operations, available labor, a low-cost operating environment, and close proximity to the fast-growing Southeast U.S.

More Information On Spec Building Opportunities


CONNECT WITH US


Call: 
843-577-7678
 
Email:
staff@maritimesc.org

  
Mail:  
 4500 Leeds Ave, Suite 207
   N. Charleston, SC  29405

   
    Visit:
     4500 Leeds Ave, Suite 207
   N. Charleston, SC  29405

Powered by Wild Apricot Membership Software